How to install the intelligent integral shower room?

- Jun 03, 2019-

How to install the intelligent integral shower room?


The preparation and installation of the basin, the basin must be carefully installed, water test is an essential part to see whether the product packaging is complete, after opening to check whether its configuration is complete. Prepare the necessary tools and put them together for easy access. Next, prepare to install the low basin, assemble the parts of the basin, adjust the level of the basin, and ensure that there is no water in the basin and the basin bottom. The hose can be telescoped with distance. After the connection between the bottom of the basin and the floor drain is firmly installed, the water test is needed to ensure that the drainage is smooth and unimpeded. Before the housing is installed, the installed bottom basin should also be protected in time.


Make clear the drainage situation of bathroom to prevent the concealed pipeline from exploding when punching. Use pencil and horizontal ruler to determine the drilling position of aluminium material near the wall, and use impact drill to drill holes. Whether the shower room is safe or not has an important relationship with the normal installation of the room. Whether the location drilling is accurate, whether the fittings are installed tightly or not, and whether the waterproof seal is well done all affect the normal use of the product. Put the rubber particles in the drill hole and lock the aluminium bar to the wall with a screw. Attention should be paid to adjusting continuously while installing in order to maintain the verticality of aluminium.


When fixing the glass, the glass clamp is locked at the bottom hole, the flat glass or bending glass bottom tribe is put into the glass clamp trough, and the aluminum material is pushed into the wall slowly. Then fix it with a screw. After fixing the glass, drill holes at the corresponding position above the fixed glass, install the fixed seat (straight/inclined) and connect the pipe jacking. Fix it to the top of the glass with the elbow sleeve. The positioning position is equipped with a shelf, a laminate nut is tightened, and the laminate glass is fixed to maintain the vertical and horizontal position. Pay attention to waterproofing under fixed glass aluminium. Fix the hardware of the movable door, and install the hinge at the reserved hole of the fixed door. After loading, adjust the position of the axle core of lotus leaf until the door is closed and the handle is good.